Challenge:
Our client was seeking to create a cyclelane on a busy CBD road, without using a product engineered into the road.
Solution:
By using Vanguard's Traffic Separator System, this enabled the client to achieve their project requirements around safety, whilst knowing that if the road layout changed in the future, the separators can simply be unbolted and relocated.
Talk to us