Rubber Kerb Blocks.
CODE:
Modular rubber kerb blocks provide a fast way to build traffic islands, eliminating the common industry challenge of waiting for concrete to cure.
Made from heavy duty rubber, these modular blocks can be cut to form specific shapes to suit your project. Just place and screw in each block to create the outline of your island, then infill with your preferred material – such as concrete, asphalt, synthetic grass, mulch, pretty much anything you like!
Vanguard can help you specify what you need for your project – contact us for a free consultation
- Completely customisable to suit your project
- Made from recycled rubber
- Robust – up to 27kg per block
- Removable – great for trials or permanent installation
- Quick to install, no curing time – significantly reduces TTM costs
Options
Videos
Spec Sheets
Options
Image
Code
Description
Profile
Module Size

49-RKSM1S
Rubber Kerb Block
Semi-Mountable
1000mm Straight

49-RKSM1R
Rubber Kerb Block
Semi-Mountable
1000mm Radius

49-RKSM5
Rubber Kerb Block
Semi-Mountable
500mm Radius

49-RKSM3
Rubber Kerb Block
Semi-Mountable
300mm Radius

49-RKSB1S
Rubber Kerb Block
Semi-Barrier
1000mm Straight

49-RKSB1R
Rubber Kerb Block
Semi-Barrier
1000mm Radius

49-RKSM5
Rubber Kerb Block
Semi-Barrier
500mm Radius

49-RKSM3
Rubber Kerb Block
Semi-Barrier
300mm Radius
Videos
Rubber Kerb Blocks | Overview
Modular Kerbing in Action: A 5-Hour Intersection Safety Upgrade
Spec Sheets
FAQs.
No data was found
You may also be interested in
CODE: 49-RCIM55-G
Modular rubber sections that allow for fast, easy construction of small traffic islands or lane separation.Much more cost effective than…
CODE: 49-RTI
Modular rubber sections that allow for fast, easy construction of small traffic islands or lane separation.Much more cost-effective than…
CODE: 49-TS
Rubber Traffic Separator, also dubbed as ‘the traffic snake’, is a robust interlocking system is used to separate lanes and…
What our clients are saying.
Hear what our customers have to say about working with Vanguard to get their safety projects completed.